China Resources Double Crane

March 11, 2023

Latest company news about China Resources Double Crane

 

 

China Resources Double Crane

——

Carrier And Shuttle Pallet ASRS

 

 

Carrier And Shuttle Pallet ASRS  www.heavyracking.com

 

 

As a pharmaceutical enterprise that entered the infusion field in the early stage, China Resources Double Crane Pharmaceutical Company Limited (CR Double-Crane) deeply promoted the concept of "Reassurance with CR Double-Crane infusion". Through the second entrepreneurial strategy focus, CR Double-Crane went public, and listed LVP (Large Volume Parenteral) as one of its strategic development goals in 1997. At present, the company has many infusion production bases in China, and has introduced international advanced technology and equipment from Germany, Japan, Italy and other countries. CR Double-Crane insists on taking the lead in management, technology, quality and equipment. With a high level as a new starting point, it has gradually developed into a leading enterprise in the field of infusion in China. And it is vividly known as the "national team" in the industry.


With the expansion of the group's business volume, Xi’an Jingxi Double-Crane Pharmaceutical Co., Ltd. added 8 new production lines. The original warehouse area was 10000 m², with a height of 6500mm. It was stored in a two-tier manner, with a storage capacity of more than 6000 and 35 warehouse operators. But the delivery efficiency was low, and it could not satisfy the production storage capacity at all. Only 3 extra warehouses can be rented, with a total area of 3000m². The annual rent of the extra warehouses is more than 6 million yuan, and the operation and management are very inconvenient. This problem has been plagued by the Jingxi base.

After communicating with the design institute, it was finally decided to raise the original warehouse to 12.5 meters, using the shuttle racking system with a storage capacity of 11800 pallets, which can rent less than one extra warehouse. Later, Double-Crane was very interested in carrier and shuttle automated high-density storage system. in his external communication. Through the introduction and contact with our company, our company sent a planning and design team to Jingxi to communicate with customers. Double-Crane requires the following effects:

1. The extra warehouse is fully recovered.

2. It is fully automated to improve efficiency. The daily import and export volume is 1300 pallets, reducing warehouse operators.

3. The warehouse management system is seamlessly connected with the Oracle system of CR Double-Crane.

4. The construction period is 3 months.

After investigation, planning, design and public bidding, our company carried out the reconstruction and construction of the warehouse of the Xijin base. The project is the world's large-scale carrier and shuttle automated high-density storage system, designs 25580 cargo spaces, and imports and exports 1539 pallets a day. The construction task of the project is tight and difficult. Our company invested a team of more than 70 installers and more than 20 software and electrical engineers. After more than 90 days of installation and commissioning, all the extra warehouses were recovered, and the number of warehouse operators was reduced to 9. After a long time of operation, the system worked well, and the customers gave us high praise.

 

Huayide Intelligent · Warehouse Racking · Made In China


 

 

p001.jpg

p002.jpg

Huayide Intelligent · Warehouse Racking · Made In China

p003.jpg

Huayide Intelligent · Warehouse Racking · Made In China

p002.jpg

p004.jpg

 

Huayide Intelligent · Warehouse Storage Rack · Made In China


 

 

Ensure the quality of Huayide racking products

 

1 The raw material of the shelf is customized from China's large steel group of high quality carbon steel, durable and strong, to ensure the quality of the product from the source.
2 The shelf welding adopts dioxygen protection welding, the welding joint has good cracking resistance, small welding deformation, beautiful forming, and does not need slag cleaning.
3 Each column and beam of the shelf are designed by professional personnel with professional technology and cut by professional equipment, so as to ensure the accurate size of the shelf.
4 Professional spray before treatment, oil removal, rust removal, phosphating, powder, and then in high temperature oven baking molding, wear-resistant, rust proof.

 

Warehouse Storage Rack  www.heavyracking.com Warehouse Storage Rack  www.heavyracking.com

 

Warehouse Storage Rack  www.heavyracking.com

 

Warehouse Storage Rack  www.heavyracking.com Warehouse Storage Rack  www.heavyracking.com