Project name: BESTORE

 

Integrated Logistics Center Stacker Crane Clad Phase Ⅰ Ⅱ

 

 

Height: 22.8       Number of goods: 19600  Operating time: November 2017
Main equipment 10 stackers, 1 set of conveying system, 1 set of rack system, and 1 set of WCS/RFS software system

 

 

Height: 22.1       Number of goods: 18232     Operating time: November 2021
Main equipment 10 stackers, 1 set of conveying system, 1 set of rack system, and 1 set of WCS/RFS software system

 

 

BESTORE Integrated Logistics Center

 

 

 

Clad Rack ASRS Clad Rack ASRS

 

 

BESTORE Integrated Logistics Center BESTORE Integrated Logistics Center

 

 

BESTORE Integrated Logistics Center BESTORE Integrated Logistics Center

BESTORE Integrated Logistics CenterBESTORE Integrated Logistics Center

 

 

Huayide Intelligent · Warehouse Storage Rack · Made In China

 

 

BESTORE Integrated Logistics Center BESTORE Integrated Logistics Center

BESTORE Integrated Logistics Center BESTORE Integrated Logistics Center

BESTORE Integrated Logistics Center BESTORE Integrated Logistics Center

 

 

Huayide Intelligent · Warehouse Storage Rack · Made In China

 

 

BESTORE Integrated Logistics CenterBESTORE Integrated Logistics Center

 

 

Clad Rack ASRSClad Rack ASRSClad Rack ASRSClad Rack ASRS

 

 

Huayide Intelligent · Warehouse Storage Rack · Made In China


 

 

 

 Steel Pallet  Steel Pallet

 

latest company news about BESTORE Integrated Logistics Center  21

 

 Steel Pallet  Steel Pallet

 

 

Huayide Intelligent · Warehouse Storage Rack · Made In China


 

 

Ensure the quality of Huayide racking products

 

1 The raw material of the shelf is customized from China's large steel group of high quality carbon steel, durable and strong, to ensure the quality of the product from the source.
2 The shelf welding adopts dioxygen protection welding, the welding joint has good cracking resistance, small welding deformation, beautiful forming, and does not need slag cleaning.
3 Each column and beam of the shelf are designed by professional personnel with professional technology and cut by professional equipment, so as to ensure the accurate size of the shelf.
4 Professional spray before treatment, oil removal, rust removal, phosphating, powder, and then in high temperature oven baking molding, wear-resistant, rust proof.